We do machine processing and assembly of precision sheet metal parts primarily and its associated parts.
We deliver high quality products to you in two days at an average.

Die-les Forming Compared to Common Processing

Die-les Forming

[Caution] Time for delivery may vary depending on the tolerance, the material, and the form.

Conventional Process

1.Priduct design

1.Product design

1day

2.Die design

2.Die design

5days

3.Die material purchase

3.Die material purchase

7days

4.Machining

4.Machining

10days

5.Quenching

5.Quenching

12days

6.Wire-EDM

6.Wire-EDM

15days

7.Grind

7.Grind

17days

8.Assemble

8.Assemble

19days

9.Punch trial

9.Punch trial

21days

10.Production

10.Production

26days

11.Transport

11.Transport

29days

12.nohin

12.Delivery

total: 29days

Dieless Forming(forming without die)

1.Priduct design

1.Product design

1day

2.Dieless Forming(forming without die)

2.Dieless Forming
(forming without die)

6days

3.Transport

3.Transport

9days

4.Delivery

4.Delivery

total: 9days

Products manufactured with Dieless Forming method can be delivered
18 days earlier.